| Axe Valley |
| Bampton and Beer Downs
|
| Bideford Bay Coast |
| Bigbury Bay Coastal Plateau |
| Blackdown Hills
|
| Blackdown Hills Scarp |
| Bolt Tail and Start Point Coastal Plateau |
| Bovey Basin |
| Breccia Hills and Coast |
| Broadbury Ridges |
| Central Dartmoor |
| Clyst Lowland Farmlands |
| Codden Hill and Wooded Estates |
| Crediton Rolling Farmland |
| Cruwys Morchard Wooded and Farmed Valleys |
| Cullompton Rolling Farmland |
| Culm Valley Lowlands
|
| Dart Estuary |
| Denbury and Kerswell Farmlands |
| East Dartmoor Moorland Fringes
|
| East Devon Central Ridge
|
| Eastern Blackdown Ridge
|
| Exe Estuary and Farmlands |
| Exe Valley |
| Exeter Slopes and Hills |
| Exmoor Fringe |
| Froward Point to Berry Head Coastal Plateau |
| Haldon Ridge and Foothills |
| Hartland Peninsula |
| High Culm Ridges |
| High Dartmoor North |
| High Dartmoor South |
| High Taw Farmland |
| High Torridge Culm Plateau |
| Lower Tamar and Tavy Valleys |
| Lundy |
| Mid Avon and West Dart Valleys and Ridges |
| Mid Dart Valley and Slopes |
| Middle Tamar Valley |
| Moretonhampstead Moorland Fringes |
| North Devon Coastal Downs |
| North Devon Downs |
| North Devon High Coast |
| Pebble Bed Heaths and Farmland |
| Plymouth Northern Wooded Slopes |
| Plymouth Sound Eastern Plateau |
| Plymouth and Modbury Farmland |
| River Tavy Middle Valley |
| Salcombe to Kingsbridge Estuary |
| Sidmouth and Lyme Bay Coastal Plateau |
| South Molton Farmland |
| Southern Dartmoor and Fringes |
| Start Bay Coastal Hinterland |
| Tamar Upland Fringe |
| Tavistock Dartmoor Fringes |
| Taw Valley |
| Taw-Torridge Estuary |
| Teign Estuary |
| Teign Valley and Slopes |
| Torbay Hinterland |
| Torridge Valley |
| Upper Tamar Tributary Valleys |
| West Torridge Upland Farmland |
| Western Culm Plateau |
| Witheridge and Rackenford Moor |
| Wootton Hills |
| Yeo Uplands and Slopes |
| Yeo, Culm and Exe Lowlands |
| <all other values> |
| 0. No details yet / Not started yet / Decision not to undertake plan |
| 1. Neighbourhood Area Designated |
| 2. Initial Consultation and Evidence Gathering |
| 3. Aims and Objectives Produced / Plan Being Drafted |
| 4. Draft Plan Produced |
| 5. Pre-submission Consultation |
| 6. Plan Submitted / Submission Consultation |
| 7. Examination |
| 8. Recommended to Referendum |
| 9. Approved at Referendum |
| 10. Made (or 'Adopted') |
| 11. Plan Under Review |
| 12. Review Complete / Minor (Non-material) Updates Agreed |
| 13. First Plan – Made. Pre-submission Consultation on Revised Plan (Material Modifications) |
| 14. First Plan – Made. Revised Plan Submitted |
| 15. First Plan – Made. Revised Plan at Examination |
| 16. First Plan – Made. Revised Plan – Recommended to Referendum |
| 17. First Plan – Made. Revised Plan – Approved at Referendum |